HomeCapabilitiesRailway infrastructure
Railway infrastructure

Power, carried.

Diesel generation, distribution, control and battery backup, integrated into railway coaches and tested as they will run: under vibration, in weather, on the move.

8Vehicle platforms
200+Coaches last year
175+DETC at PLW Patiala
Power car and inspection car inside the ICF Chennai workshop ICF Chennai · SPC and SPIC programme
Cutaway view of an SSE power car showing generator, panels and battery systems
The work

A power house on wheels.

A power car is not a generator dropped into a shell. It is a small power station: prime power, distribution, protection, control, battery backup, cooling, exhaust and a cable network that has to survive years of motion.

We integrate the complete system, test it as a system and hand over the records that let the railway maintain it. The same discipline applies to an underslung unit, a silent power car or a diesel electric tower car.

8Platforms integrated
200+Coaches last year
50+SPC & SPIC at ICF
The fleet

Eight platforms. One discipline.

Each platform has a different layout and a different duty cycle. The standard underneath is the same: the right component, the right clearance, the right record.

PC · Power Car Cutaway view of an SSE power car with integrated power systems

Power Car

Complete power generation and distribution integrated into a railway coach. The onboard power house for reliable supply through long routes and demanding duty cycles.

  • ScopeGeneration, distribution, control
  • IntegrationCoach build
  • TestingSystem-level

Images are representative of SSE platform work. Configurations vary by programme and coach type.

Inside the coach

Every system, in its place.

Generation, distribution, control, backup and routing are designed together. That is how a coach stays serviceable for the people who maintain it long after we hand it over.

01

Diesel generation

Prime power, mounted, aligned and connected so the set performs as installed, not just on the test bed.

02

Distribution & control

Panels, protection, changeover and control logic arranged for safe operation and straightforward fault-finding.

03

Battery & backup

Standby and cranking batteries, isolation and charging, placed for access and thermal conditions.

04

Cable routing

Trays, glands, looms and ferruling planned as a system, with separation and support that survive vibration.

05

Interior services

Lighting, ventilation and auxiliary circuits integrated with the coach interior, not added after it.

06

Testing & records

Pre-commissioning checks, functional testing and documentation before the coach leaves the works.

Why SSE

Built for the way railways actually run.

Railway equipment does not get a quiet room and a stable supply. It gets heat, dust, vibration and a maintenance window measured in hours.

01

Vibration-resistant execution

Mounting, support and connection details chosen for continuous motion and heavy-duty operation.

02

Compact, serviceable layouts

Space used carefully, but access kept open for inspection, servicing and replacement.

03

Zero-error wiring

Structured routing, ferruling and point-to-point checks to catch faults before they become failures.

04

Long-distance reliability

Systems built for continuous operation across routes with changing weather and load profiles.

05

Documented testing

Checks recorded as they happen, so the maintenance team inherits evidence rather than assumptions.

06

On-time delivery

200+ coaches completed and dispatched last year, with a CIL certificate of appreciation for delivery without LD.

The record

Coaches, platforms and programmes.

A selected record of railway projects and supplies. The work behind these rows includes fabrication, wiring, integration, testing and documentation.

Project / supplyLocationQuantityPeriod
DETC projectICF Chennai35 coaches2019
DEMU projectICF Chennai16 coaches2019–2020
SPART projectICF Chennai34 coaches2019–2020
USPC projectICF Chennai7 coaches2019–2020
Mozambique power carMCF Raebareli2 coaches2021
Radiator chamber supplyICF Chennai312 nos—
Aluminium radiator chamberRCF Kapurthala35 nos—
Certificate of appreciation from CIL for timely completion without liquidated damages
Delivery, recognised

Without LD. Without excuses.

Over the last year we completed and dispatched material for more than 200 coaches. CIL recognised the work with a certificate of appreciation for completing and dispatching it without liquidated damages.

That is the standard we plan for: the date is part of the specification, not a target to negotiate at the end.

“200+ coaches delivered last year. The certificate is a by-product of doing the boring things on time.”

SSE · Railway delivery team