Critical power, commissioned.

Erection and commissioning of diesel generator sets for data centres, industrial plants and facilities that cannot afford a dark hour. From foundation and alignment to load testing and handover.

Data centresMission-critical duty
Pan-IndiaSite teams
End-to-endOne accountable contract
Large diesel generator set inside an industrial plant Generator room · erection and commissioning
Generator set being installed at night with a lifting crew
The work

The last metre of the power chain.

A generator is only critical power when the whole installation works: the plinth, the alignment, the exhaust, the fuel line, the cables, the control logic and the test that proves it under load.

We take the set from arrival to handover, coordinating the civil interface, the mechanical installation and the electrical connection. The client gets one team to call while the commissioning window is open.

1Accountable team
0Handover gaps
100%Load-tested before handover
Scope

From the plinth to the load bank.

A DG installation is a chain of small interfaces. We plan the whole chain, then execute each interface as if the next one depends on it, because it does.

01

Foundation & alignment

Plinth checks, base frame placement, levelling, anti-vibration mounting and alignment before the set is connected.

02

Exhaust, radiator & fuel

Exhaust routing, radiator air paths, fuel storage, transfer lines and the details that keep the room within its limits.

03

Electrical & control

Power cables, control wiring, changeover, metering, protection and the interface with the plant distribution system.

04

Earthing & safety

Earthing, isolation, labelling and fire safety coordinated with the room and the plant's operating rules.

05

Testing & load

No-load and load tests, protection checks, governor and voltage checks, and a witnessed commissioning run.

06

Documentation

As-built records, test sheets and handover documents that give the maintenance team a clean starting point.

How we deliver

Five steps. No missing owner.

The sequence is agreed before mobilisation, then tracked against the site's real constraints: access, noise, fuel, heat and the hours the plant can give us.

01

Survey

Room, access route, load, utilities and interfaces checked against the drawing.

02

Plan

Method statement, lifting plan, sequence, manpower and the shutdown windows.

03

Install

Placement, alignment, mechanical connections, cabling and controls.

04

Test

Checks, load run and witnessed commissioning, with faults closed on site.

05

Hand over

Records, demonstration and the contacts the client needs afterwards.

On site

The installation is the proof.

Lifting, alignment and connection work on operating sites, often at night and inside a fixed window.

Crane lifting a generator set at an industrial site
Lifting & placement
Crew guiding a generator set during installation
Rigging crew
Generator being lowered into position
Positioning
Crane and generator set inside a plant
Site access
Night shift generator installation
Night shift
Engineer making final connections to a generator set
Final connections
Where it matters

Power that has to turn up.

The same discipline suits any site where the standby supply is part of the operation, not a compliance box.

01

Data centres

Duty and standby sets, fuel systems and commissioning windows planned around an operating facility.

02

Process plants

Critical power for chemical, pharmaceutical and process sites where an unplanned stop is expensive.

03

Healthcare

Standby supply for facilities where life-safety and clinical equipment cannot wait for a restart.

04

Commercial campuses

Reliable backup for offices, retail and mixed-use developments with limited plant-room space.

05

Infrastructure

Airports, transport and utility sites that need a tested, documented standby supply.

06

Industrial utilities

Generator rooms, fuel handling and electrical interfaces tied into an existing plant.

Radiator and generator equipment lined up for installation
The standard

Specified. Installed. Tested.

We do not hand over a generator that has only been started. We hand over an installation that has been checked under load, with the records to show what was done.

“The client should not have to discover the installation after we leave.”

SSE · DG commissioning team