Keep it running. Upgrade it live.

Annual rate contracts, shutdowns and brownfield expansion, planned around plants that cannot stop. One crew for repairs, revamps and new tie-ins.

ARCAnnual rate contracts
24/7Live-plant mindset
India& Middle East
Crew erecting piping inside an operating industrial plant
The work

The work that cannot wait for a new plant.

Most industrial work is not a greenfield story. It is a repair window, a debottlenecking tie-in, a shutdown that has to finish before the plant restarts, or a rate contract that keeps the site moving through the year.

We plan around the plant's constraints: isolation, permits, access, hot work, night shifts and the handback deadline. The crew is set up to work cleanly in an operating environment, not to turn the site into a construction camp.

ShutdownsTurnaroundsRevampsTie-insExpansion
Scope

Six ways to keep the plant moving.

From a standing maintenance crew to a fixed-window shutdown, the scope is shaped around the operating reality of the site.

01

Annual rate contracts

A standing mechanical and fabrication resource for routine repairs, modifications and site support through the year.

02

Shutdowns & turnarounds

Planned execution for repairs, revamps and reconditioning, with the manpower and sequence matched to the window.

03

Brownfield expansion

New equipment, structures and piping tied into an existing plant without losing sight of the operating unit next door.

04

Repair & reconditioning

Fabrication, welding, alignment and mechanical repair for equipment and systems that have to return to service.

05

Tie-ins & hot work

Isolation, permits, fire watch and controlled hot work for new connections into live systems.

06

Mechanical & electrical

Mechanical erection, piping, structural work and electrical interfaces coordinated under one contract.

A shutdown, planned

The window is the specification.

A shutdown has a fixed start and a fixed restart. The plan works backwards from the restart, then removes everything that could put it at risk.

01

Survey & scope

Walk the plant, confirm access, record the repair scope and freeze the work list.

02

Isolate & permit

Isolation, lock-out, gas tests, permits and fire watch agreed before mobilisation.

03

Execute

Staged access, shift plans, lifting and hot work sequenced around the critical path.

04

Test

Inspection, pressure testing, alignment checks and sign-off before closing access.

05

Hand back

Housekeeping, removal of temporary works and a clean, documented restart.

Engineer inspecting generator equipment during a shutdown
Working live

Built around a live plant.

Access is staged. Work fronts are released in sequence. Temporary power, lighting and ventilation are planned, not improvised. The area is handed back clean at the end of every shift.

Supervisors carry the permit discipline and the method statement. The client's operations team gets a single point of contact and a daily picture of what moved.

PermitLed execution
ShiftPlanned handovers
CleanHandback

“A shutdown is not successful because the work was big. It is successful because the plant restarted on time and nobody had to go back in.”