Foundation & alignment
Plinth checks, base frame placement, levelling, anti-vibration mounting and alignment before the set is connected.
Erection and commissioning of diesel generator sets for data centres, industrial plants and facilities that cannot afford a dark hour. From foundation and alignment to load testing and handover.
Generator room · erection and commissioning
A generator is only critical power when the whole installation works: the plinth, the alignment, the exhaust, the fuel line, the cables, the control logic and the test that proves it under load.
We take the set from arrival to handover, coordinating the civil interface, the mechanical installation and the electrical connection. The client gets one team to call while the commissioning window is open.
A DG installation is a chain of small interfaces. We plan the whole chain, then execute each interface as if the next one depends on it, because it does.
Plinth checks, base frame placement, levelling, anti-vibration mounting and alignment before the set is connected.
Exhaust routing, radiator air paths, fuel storage, transfer lines and the details that keep the room within its limits.
Power cables, control wiring, changeover, metering, protection and the interface with the plant distribution system.
Earthing, isolation, labelling and fire safety coordinated with the room and the plant's operating rules.
No-load and load tests, protection checks, governor and voltage checks, and a witnessed commissioning run.
As-built records, test sheets and handover documents that give the maintenance team a clean starting point.
The sequence is agreed before mobilisation, then tracked against the site's real constraints: access, noise, fuel, heat and the hours the plant can give us.
Room, access route, load, utilities and interfaces checked against the drawing.
Method statement, lifting plan, sequence, manpower and the shutdown windows.
Placement, alignment, mechanical connections, cabling and controls.
Checks, load run and witnessed commissioning, with faults closed on site.
Records, demonstration and the contacts the client needs afterwards.
Lifting, alignment and connection work on operating sites, often at night and inside a fixed window.






The same discipline suits any site where the standby supply is part of the operation, not a compliance box.
Duty and standby sets, fuel systems and commissioning windows planned around an operating facility.
Critical power for chemical, pharmaceutical and process sites where an unplanned stop is expensive.
Standby supply for facilities where life-safety and clinical equipment cannot wait for a restart.
Reliable backup for offices, retail and mixed-use developments with limited plant-room space.
Airports, transport and utility sites that need a tested, documented standby supply.
Generator rooms, fuel handling and electrical interfaces tied into an existing plant.
We do not hand over a generator that has only been started. We hand over an installation that has been checked under load, with the records to show what was done.
“The client should not have to discover the installation after we leave.”
SSE · DG commissioning team