Annual rate contracts
A standing mechanical and fabrication resource for routine repairs, modifications and site support through the year.
Annual rate contracts, shutdowns and brownfield expansion, planned around plants that cannot stop. One crew for repairs, revamps and new tie-ins.
Most industrial work is not a greenfield story. It is a repair window, a debottlenecking tie-in, a shutdown that has to finish before the plant restarts, or a rate contract that keeps the site moving through the year.
We plan around the plant's constraints: isolation, permits, access, hot work, night shifts and the handback deadline. The crew is set up to work cleanly in an operating environment, not to turn the site into a construction camp.
From a standing maintenance crew to a fixed-window shutdown, the scope is shaped around the operating reality of the site.
A standing mechanical and fabrication resource for routine repairs, modifications and site support through the year.
Planned execution for repairs, revamps and reconditioning, with the manpower and sequence matched to the window.
New equipment, structures and piping tied into an existing plant without losing sight of the operating unit next door.
Fabrication, welding, alignment and mechanical repair for equipment and systems that have to return to service.
Isolation, permits, fire watch and controlled hot work for new connections into live systems.
Mechanical erection, piping, structural work and electrical interfaces coordinated under one contract.
A shutdown has a fixed start and a fixed restart. The plan works backwards from the restart, then removes everything that could put it at risk.
Walk the plant, confirm access, record the repair scope and freeze the work list.
Isolation, lock-out, gas tests, permits and fire watch agreed before mobilisation.
Staged access, shift plans, lifting and hot work sequenced around the critical path.
Inspection, pressure testing, alignment checks and sign-off before closing access.
Housekeeping, removal of temporary works and a clean, documented restart.
Access is staged. Work fronts are released in sequence. Temporary power, lighting and ventilation are planned, not improvised. The area is handed back clean at the end of every shift.
Supervisors carry the permit discipline and the method statement. The client's operations team gets a single point of contact and a daily picture of what moved.
“A shutdown is not successful because the work was big. It is successful because the plant restarted on time and nobody had to go back in.”
SSE · ARC & brownfield team